Conservation and Improvement Project - Week Ending 25th March 2016

This week the electrician has been working at the Hall adding the conduit to take the cables that will link the data projector to a computer. This will be useful for films and presentations. Final electrical cabling has been installed for the new lighting.

The main frame of the stage is now in place. This has been a challenging job as there is no space between the posts and the wall and the joiner has to slot in the mortice and tenon joints.

With the stage fixed in position it was possible to screed the floor that will be under the stage so that it will be level with the hall floor finish when the timber flooring is laid.

Richard Frost and son have now worked on the gable ends of the roof and are ready to progress with the ridge.