A hole needs to be dug in the storeroom floor and under the storeroom wall to enable the new power supply cable to enter the building. Steve Baber has lifted some floor boards in the storeroom and started to dig down into the old floor surface to get down to the level the power cable will enter the room from a trench that will be dug outside the building.
No comments:
Post a Comment