Steve Baber and Ron Moore worked to break through to the trench under the wall in the storeroom to enable the power supply cable to be routed into the storeroom. The floorboard in the Hall where the existing power supply is located under the floor have been lifted to allow Western Power access to withdraw the cable and re-route it.
No comments:
Post a Comment