On Monday, DART Electrics, the electrical contractors were on site completing the first fix electrics. They installed cabling for a power circuit, a lighting circuit, and supply for cooker, dishwasher and wall mounted boiler.
By the end of the week work had started on adding insulation to the north-facing wall. This is a single skinned block wall and an internal timber framed wall will be constructed supporting the insulation and providing an air gap between the two skins. Damp-proof membrane is also fitted for added protection against any rising damp or damp penetration.